using rules on calendar

All questions about Control-M jobs definitions
Post Reply
User avatar
Enpesiri
Nouveau
Nouveau
Posts: 6
Joined: 03 Feb 2010 12:00

using rules on calendar

Post by Enpesiri » 16 Apr 2013 3:32

Hi.
i've a calendar working day.
I need to schedule a job in the D5 (5th working day of month) and the 17th day on month (include Sat & Sun)
if i put in the rules +17,D5 and in calendar "workingDay" (my calendar name) the job is scheduled every working days plus 17th.
EG: in sepetmber i want to schedule 6th and 17th
Anyone have solutions to schedule job with only workingday calendar?
thx

User avatar
CTMUSERIND
Nouveau
Nouveau
Posts: 5
Joined: 12 Feb 2013 12:00

Re: using rules on calendar

Post by CTMUSERIND » 17 Apr 2013 9:38

HI,

Just configure a new calendar which includes all the working day and 17 th of each month irrespective to the working day.

Then in Job from rule choose D5 for 5th working day and 17 for each 17th of the month.

Don't mention any sign before 17.(In rule field it should be like 17,D5)

Thanks

User avatar
Enpesiri
Nouveau
Nouveau
Posts: 6
Joined: 03 Feb 2010 12:00

Post by Enpesiri » 17 Apr 2013 12:15

Yes, this is a way.
but Manual of ControlM server says...
Schedule the job on the 1st and 15th day of the month even when they do not appear in the calendar, and to ensure that the job will not be scheduled on the 10th and 25th day of the month even when they appear in the calendar, do the following in the Special Month Days tab.
1. Click Rules in the Month Days area.
2. In the Month Days tab
A. Click 1 and Ctrl 15 in the tab’s calendar.
B. Click +n.
C. Click 10 and Ctrl 25 in the tab’s calendar.
D. Click -n.
E. Click OK.
3. In the Month Days area, specify the calendar name.
The job will be ordered on every day marked as a working day in the calendar, except on the 10th and 25th; it will also be ordered on the 1st and 15th of the month even if they are not working days in the calendar
I think that this is my case: +17,D5 but don't work. :(

Other way must be clone the job: in one schedule with calendar and D5, and other job without calendar and 17th.
I only want use on my server one calendar for all 25564 jobs scheduled