different timings

Posted: 27 Dec 2007 12:02
by Aneez
Hi,
Can I set up a job such that it runs at different times during the day?
Say 8:30am, 10:30am, 12:30pm, and 3:30pm. This job has to run daily at these times.

Re: different timings

Posted: 27 Dec 2007 12:26
by Dilbert
Aneez wrote:Hi,
Can I set up a job such that it runs at different times during the day?
Say 8:30am, 10:30am, 12:30pm, and 3:30pm. This job has to run daily at these times.
Maybe you can use cyclic job, set the rerun parameter (4 rerun) for running job every 2 hours from job start.

If somebody knows a better solution...

Posted: 27 Dec 2007 3:42
by philmalmaison
make 2 jobs, one to be sched from 8h30 until 13h00 every 2 hours and max rerun 3
and one for 3h30

regards
Philmalmaison

Posted: 27 Dec 2007 4:16
by Dilbert
philmalmaison wrote:make 2 jobs, one to be sched from 8h30 until 13h00 every 2 hours and max rerun 3
and one for 3h30

regards
Philmalmaison
Oh, yes, there is 3 hours between 12:30 and 3:30. Mea culpa. :)

Posted: 28 Dec 2007 5:52
by Aneez
I created 2 jobs. One which runs at 8:30am and 10:30. This is cyclic with rerun every 2 hours. Submitted between 8:30 to 11:00.
The second is a cyclic with rerun every 3 hours. Submitted between 12:30 to 16:00.


Do i need the maximum rerun counter for this?

Posted: 28 Dec 2007 8:30
by philmalmaison
maxrun is just to be shure about number of scheduling.
no necessary need for you.
regards
Philmalmaison