Hi,
Can I set up a job such that it runs at different times during the day?
Say 8:30am, 10:30am, 12:30pm, and 3:30pm. This job has to run daily at these times.
different timings
Re: different timings
Maybe you can use cyclic job, set the rerun parameter (4 rerun) for running job every 2 hours from job start.Aneez wrote:Hi,
Can I set up a job such that it runs at different times during the day?
Say 8:30am, 10:30am, 12:30pm, and 3:30pm. This job has to run daily at these times.
If somebody knows a better solution...
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France