Linux Cluster

Everything about Control-M agents installation or setup.
Post Reply
User avatar
kylo_h
Nouveau
Nouveau
Posts: 57
Joined: 13 May 2008 12:00

Linux Cluster

Post by kylo_h » 10 Nov 2010 1:21

Hi Guys,

We have an application called Wallstreet running on a Linux Cluster.

We want to schedule an End-Of-Day, which should run on node 1 but if node 1 fails, the jobs should run on Node 2.

How do I set this up from a Control-M level?

Node Groups?

User avatar
kylo_h
Nouveau
Nouveau
Posts: 57
Joined: 13 May 2008 12:00

Post by kylo_h » 10 Nov 2010 2:42

I found a solution... Thanks

Post Reply