Migrating weekly backups to monthly backups

Everything about Control-M Server installation or setup.
Post Reply
User avatar
kernel301
Nouveau
Nouveau
Posts: 12
Joined: 07 May 2010 12:00

Migrating weekly backups to monthly backups

Post by kernel301 » 01 Feb 2011 1:43

Hello,

I have weekly backups that belong to table1 and use a calendar cal1 (cal1: if a day is a holiday the job is executed the following day even if it is not as a holiday) and turn off after application, each stop is for a table linked to its application and use the same calendar cal1.

So i how to run these backups at the end of each month regardless of the day (holiday or not) but the application stop must be made before, as mentioned above schedule does allow to stop the application so we can not change Backup Plan

Thank you for your reply

Regards

User avatar
philmalmaison
Nouveau
Nouveau
Posts: 1148
Joined: 08 Jun 2007 12:00
Location: Ile de France

Post by philmalmaison » 03 Feb 2011 4:28

Hi,
make a scheduling group with all TAG for all jobs (Daily/Weekly/monthy or other) and select the option for the scheduling group to work even when a job is not there.
So if a job is on another frequency, the conditions will be added

Regards,
Philmalmaison