Hello,
I am configuring a job in Control-M Desktop Version 7.
I'd like to know if there is a way to parameterize and pass as a command line argument, the last time the job ran successfully.
Is this a value I can retrieve from the Control-M database somehow?
I have very limited experience with Control-M, just basic job configuring experience. I am a developer, not a Control-M administrator so if you could keep that in mind when compiling your response.
Thanks for reading!
-Zach