Hi, not sure if Im the only one with this problem but has anyone found a way of being able to have a single instance of a job which runs normally when scheduled, but when not schedueled still gets ordered in but id dummied?
I have messed around with the overbins but that has too much of an overhead and I dont really want to have two sets of jobs; one for when the jobs does run and another dummy one for when the jobs should not run.
would really be interested to hear what others have done.
Dummy jobs when not scheduled
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France