Does any know if we can change the alignment of jobs like in previous versions? You used to be able to align left, center or right on the flow of jobs. In this new version there is no option to do that.
Also when you select a view for instance to see the jobs flow is there no way to save that so each time you dont have to go back and choose the view again?
Formating of Jobs in Version 8.0
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
@Banshee06
We have make a request for Enhancement for Control-M v8.
Do you recognize this problem we have?
----------------------
Below the request we have send to BMC:
For our Control-M environment we make use of smart tables. What we need is the same look for presentation of the dependencies in the workflow in the Control-M planning, as it was in previous Control-M versions in the Control-M Desktop.
In Control-M version 8 it is now presented in alphabetical order.
It is impossible to see any relationship between the smart tables. In version 6 & 7 it is easy to insert a table between two other tables, because you can see the relationship. In version 8 this is almost impossible and takes a lot of time.
We have make a request for Enhancement for Control-M v8.
Do you recognize this problem we have?
----------------------
Below the request we have send to BMC:
For our Control-M environment we make use of smart tables. What we need is the same look for presentation of the dependencies in the workflow in the Control-M planning, as it was in previous Control-M versions in the Control-M Desktop.
In Control-M version 8 it is now presented in alphabetical order.
It is impossible to see any relationship between the smart tables. In version 6 & 7 it is easy to insert a table between two other tables, because you can see the relationship. In version 8 this is almost impossible and takes a lot of time.