recover an overwritten scheduling group.

Tools and several solutions to manage Control-M products
Post Reply
User avatar
jstarkw
Nouveau
Nouveau
Posts: 58
Joined: 14 Jan 2010 12:00

recover an overwritten scheduling group.

Post by jstarkw » 18 May 2011 9:20

Can control-m recover a scheduling group and all of its coantained jobs if someone were to overwrite it? IE Download group A containing 10 job blocks to your desktop and remove the jobs contained in the group. Add 1 job then write and upload it, thus overwtriting the orginal Group A. Is there a way to get the Original Group A with the 10 jobs back?

User avatar
gglau
Nouveau
Nouveau
Posts: 317
Joined: 13 Jun 2007 12:00

Post by gglau » 18 May 2011 9:42

For EM 6.4 and later, built-in version control by default keeps one previous version and deleted jobs/tables.

User avatar
jstarkw
Nouveau
Nouveau
Posts: 58
Joined: 14 Jan 2010 12:00

Post by jstarkw » 19 May 2011 7:17

Thank you. I see that now in the Admin. guide. What I don't see is instructions on how to recover. Can you point me to the correct guide?

User avatar
gglau
Nouveau
Nouveau
Posts: 317
Joined: 13 Jun 2007 12:00

Post by gglau » 20 May 2011 2:58

check User Guide, in the chapter "Organizing and managing job versions"

Post Reply