Hi, i have export all calendar for import in another server, but the datacenter name is not good.
i would like to know how modifie datacenter name for calendar manger
Thank you
how to modifie datacenter in calendar manger
- spassvogel47
- Nouveau
- Posts: 4
- Joined: 22 Feb 2011 12:00
Hi Dasson,
which format is the export? Is that a csv or xml format?
if so you can open this file with an editor and substitute the old datacenter for a new one.
an other solution is to import the calendar on the new sever. after that you copy the calendar in the calendar manger. with the copy function you could change the datacenter.
which format is the export? Is that a csv or xml format?
if so you can open this file with an editor and substitute the old datacenter for a new one.
an other solution is to import the calendar on the new sever. after that you copy the calendar in the calendar manger. with the copy function you could change the datacenter.
Is possible to export one calendar form a server and import in another server. Is a normal procedure when there in two or more CTM-servers in production, in this case the calendars must be aligned. Once decided wicht server in the leader, you export the calderds from this server and import them to others servers.
You can do this operation in batch mode, using the EM utilities and schedule a job that do this automatically.
Have a good day
MaurizioG
You can do this operation in batch mode, using the EM utilities and schedule a job that do this automatically.
Have a good day
MaurizioG
You do this operations:
1) if calendar is new: create a new empty one
2) if calendar can be modified on the server side (like in MVS environment happens): DOWNLOAD calendar on the EM db
3) At this point copy the calendar from one data center to destination data center with: copydefcal utility
short description from documentation:
"Calendars in one data center can be copied to a different data center and saved under the same or different names."
4) Now you must do the upload calendar action to the destination data center.
Note:
The DOWNLOAD and UPLOAD action are done with cli utility.
Have a good day
1) if calendar is new: create a new empty one
2) if calendar can be modified on the server side (like in MVS environment happens): DOWNLOAD calendar on the EM db
3) At this point copy the calendar from one data center to destination data center with: copydefcal utility
short description from documentation:
"Calendars in one data center can be copied to a different data center and saved under the same or different names."
4) Now you must do the upload calendar action to the destination data center.
Note:
The DOWNLOAD and UPLOAD action are done with cli utility.
Have a good day