Control-M v6.3 and v7.0 at the same time.

Everything about Control-M Enterprise Manager Server installation or setup.
Post Reply
User avatar
th_alejandro
Nouveau
Nouveau
Posts: 188
Joined: 26 Nov 2008 12:00
Location: Bogotá

Control-M v6.3 and v7.0 at the same time.

Post by th_alejandro » 23 Oct 2012 10:53

Currently, we are working in Control-M v6.3 (aix 5.3) in our server 'prodnorth'. We plan to create Control-M v7.0 in other server 'prodsouth (aix 7.1)'. In this moment, we have an agent in application server 'dorotea' (aix 5.3). We run jobs in this agent v6.3 without problems.

I need to guarantee that the instalation of Control-M v7.0 in server 'prodsouth' (aix 7.1) and the instalation of agent 7.0 in 'dorotea' (aix 5.3) will not to damage the agent v6.3 in 'dorotea' and boot Control-M server works well. :?

OUt installation Control-M v6.3 with AIX 5.3 use port number 13070 in server 'prodnorth'. Can I configure Control-M v7.0 with AIX 7.1 (in server 'prodsouth' using the same port number ? Exist a problem when install agents v6.3 and v7.0 in same server ? :roll:

Control-M v6.3 are named 'pentahoo' (in server prodnorth) and Control-M v7.0 will be named 'zeus' (in server prodsouth).

User avatar
mauriziog
Nouveau
Nouveau
Posts: 807
Joined: 08 Jun 2007 12:00
Location: Varese - Italy
Contact:

Post by mauriziog » 26 Oct 2012 10:30

You can have an Enterprise manager server version 7.0, that see all the servers the new with version 7.0 and the other with version 6.3.
The Enterprise manger must be "migrated" from actual version to the 7 version.

For two agents on the same machine with different versions: is possible, when you install the second you must choose another agent logical name and server-to-agent port number.
In this manner the server respond to two server with different versions.

But if you plan to upgrade the agent, that respond only to one server (the new one) you dont need to install a second agent. In the first step the agent can remain to the 6.3 version and respond to the new server version 7., and then can be upgraded to the new version mantaining all the configurations.

User avatar
th_alejandro
Nouveau
Nouveau
Posts: 188
Joined: 26 Nov 2008 12:00
Location: Bogotá

1 Agent - 2 server ctm v63 and ctm v7.0

Post by th_alejandro » 29 Oct 2012 8:04

Thanks mauriziog. another question about this :

I hace Control-M server v6.3 and Agent v6.3. I just Install Control-M server v7.0 without agents. I need that v7.0 server 'see' the agent v6.3, but the control-m server v6.3 must see it too at the same time 8) . We are in migration table by table manually 8O . Each table that have been migrated must be in control-M v7.0 using agent v6.3 and it's removed from table in control-m server v6.3. So, we need the agent v6.3 working with somre tables in v6.3 and other tables in v7.0. This is the only way that we can do that, there are too may tables using the agent v6.3. When finish the migration of all tables, we plan de unintall agent v6.3 and install agent v7.0 only.

What it's your recommendation ? 8O

User avatar
mauriziog
Nouveau
Nouveau
Posts: 807
Joined: 08 Jun 2007 12:00
Location: Varese - Italy
Contact:

Post by mauriziog » 04 Nov 2012 5:04

In your configuration of manual migration with two different servers, the better agent configuration is have two different agents one for each server.
In this manner you dont influence the old environment and in same time you have the new server v.7.0 with the agent version 7.0; with all the configurations and functionalities of the new version.

User avatar
th_alejandro
Nouveau
Nouveau
Posts: 188
Joined: 26 Nov 2008 12:00
Location: Bogotá

Thanks to all

Post by th_alejandro » 09 Nov 2012 11:41

I just install Agent v7.0 and agent v6.3 on the same machine and is working well. :D

User avatar
mauriziog
Nouveau
Nouveau
Posts: 807
Joined: 08 Jun 2007 12:00
Location: Varese - Italy
Contact:

Post by mauriziog » 10 Nov 2012 12:28

Perfect Alejandro, thanks for your feedback.

Post Reply