Related to End time

Everything about Control-M Enterprise Manager Server installation or setup.
Post Reply
maheshvenu

Related to End time

Post by maheshvenu » 24 Aug 2012 4:07

why it is required to specify greater(>) than symbol in the end time in a job while scheduling a job

User avatar
Danny
Nouveau
Nouveau
Posts: 21
Joined: 18 May 2010 12:00
Location: EMEA
Contact:

Post by Danny » 28 Aug 2012 11:11

It's not required. If the From field contains a valid time value, you can enter a > character in the Until field. This character is used to indicate that once the From time has passed, if CONTROL-M has not yet submitted the job by New Day time, it should try to submit the job as soon as possible after the New Day procedure is run (without waiting for the From time to arrive again). CONTROL-M continues to ignore the From time either until the job is submitted or until the Max Wait period expires.