I beleieve PRECMD is executed first before the job is executed in control-m.
I would like to know if it is possible to create a prereequsite condition using PRECMD under Autoedit Variables. The prereq condition can be STAT or ODAT.
If that is not possible then can I change the value of Quantitative Resource using PRECMD. For Example if Quantitative Resource "ABC" is defined to 0 can I change it to 10
using PRECMD in conrtrol-m job.
PRECMD under Auto-Edit Varables.
- philmalmaison
- Nouveau
- Posts: 1148
- Joined: 08 Jun 2007 12:00
- Location: Ile de France
Hagar wrote:You can create a condition via PRECMD by
%%PRECMD ctmcontb -ADD condition-ok ODAT
ofc you need an agent on the target system
/Hagar
Hagar
Thanks for the reply . It works fine.
If you don't mind can I ask you if this information is available in control-m manuals as I do have them.
Once again thanks for the reply.