Search found 807 matches

by mauriziog
21 Nov 2012 12:33
Forum: Control-M Server
Topic: How to get the number of jobs defined in Control M
Replies: 4
Views: 6203

If you want to have the detail of the "task type" like dummy/job/command, you can also use the Reporting Facility . I've tried now: in the template Report " definitions/job Definitions " you can select the field "Task Type" and group by this field. So in the report there are all the dummies jobs. Is...
by mauriziog
19 Nov 2012 1:58
Forum: Control-M Enterprise Manager
Topic: Shout to Program
Replies: 3
Views: 2858

Having one job that do a shout to another program in postprocessing, and so have a separate control of the result. Its not logical specially if you have control-M... :) And also in the controlM use you have contruct something, a shout and a script rather than using the controlM without programming. ...
by mauriziog
17 Nov 2012 6:15
Forum: Control-M Enterprise Manager
Topic: CCM Plugin in Control-M v7.0
Replies: 7
Views: 7500

Each client can have access, is an alternative to have CD or DVD: Eletronic Distribution

Regards
by mauriziog
16 Nov 2012 10:46
Forum: Control-M Enterprise Manager
Topic: CCM Plugin in Control-M v7.0
Replies: 7
Views: 7500

You can download directly the software you have in your licence in the BMC Eletronic Product Distribution (EPD) site:
https://webapps.bmc.com/epd/
by mauriziog
16 Nov 2012 10:43
Forum: Control-M Enterprise Manager
Topic: Shout to Program
Replies: 3
Views: 2858

For me is not necessary to build a program and use do-shout. Design a flow to do this logical: a) if a cm for db terminate well --> jobA end ok b) move a file ---> second jobB Using controlM only if the jobA terminates well the jobsB starts: is sufficient to link JOBA-TO-JobB (native functionality)....
by mauriziog
16 Nov 2012 10:37
Forum: Control-M Enterprise Manager
Topic: SNA_UDLY job
Replies: 5
Views: 4994

Is difficult without the flow draft and related calendars and schedulation to understad the problem.
If you have forecast try to simulate and replicate the scheduling situation.
by mauriziog
16 Nov 2012 10:35
Forum: Opportunités / Opportunities
Topic: Teacher for Control-M v7 Basic/Expert and Administration
Replies: 2
Views: 6921

The version 7.0 has also some new functionalities respect to 6.3 version like:
- smart tables and subtables
- bypass
- version manager
- service manager
- workload manager
- etc.

I'm also a official trainer but... I'm very far to Bogota' and so will be very expensive !
:D

Regards
by mauriziog
16 Nov 2012 10:31
Forum: Exploitation / Operation
Topic: MEXICO -- HELP OM SENDING eMAILS USING DO MAIL
Replies: 10
Views: 12668

If you have the 7.0 version you can send e-mail with attachment using the do-mail option in the step panel (nothing to build). If you has a previous version to attach the sysout, you must build program to do this and can use the do-shout or the alerts gui (GAS). In this cas the program run on the Co...
by mauriziog
16 Nov 2012 10:21
Forum: General News
Topic: Error: CM for AFT 1007
Replies: 2
Views: 14246

Seems that the destination dont answer: control that the destination ssh server is reachable and the firewall is open versus ssh server on 22 port.
by mauriziog
13 Nov 2012 4:22
Forum: SQL Scripts
Topic: Want to join avg runtime per job to job def in CME
Replies: 12
Views: 30594

Of course! As you prefer. But I want say that there is also another method to do this kind of things, using the Control-M Reporting Facility; may be more simple, or not. Only let know that exist. Then I can also add another example: once you have extracted/exported data in a shared file system, all ...
by mauriziog
13 Nov 2012 2:58
Forum: SQL Scripts
Topic: Want to join avg runtime per job to job def in CME
Replies: 12
Views: 30594

To output can be in .csv or .xls: are modifiables and dont cut any colums.
Only the pdf format can have problem with the cutting of columns (or the GUI interface).
For example if you export the report on xls file and open it with excel you can see all the colums you want....

Regards
by mauriziog
13 Nov 2012 12:29
Forum: Control-M Enterprise Manager
Topic: SNA_UDLY job
Replies: 5
Views: 4994

Why use the ctmudly command for this type of problems? Use the scheduling tab also with jobs in scheduling (/smart) tables with different calendars and schedulation if the scheduling problem is more complex. So you can use the forecast to control and simulate the schedulations, be sure to results, e...
by mauriziog
13 Nov 2012 12:23
Forum: SQL Scripts
Topic: Want to join avg runtime per job to job def in CME
Replies: 12
Views: 30594

Why you dont use the Reporting Facility ? In the Temples " Active\Active jobs " there are the following fields that can be excracted and reported: Average Runtime Average start time Elapsed Elapsed runtime EM stistic period etc. Remember also that, once defined as template, the report can be schedul...
by mauriziog
13 Nov 2012 12:13
Forum: Exploitation / Operation
Topic: Linux/Oracle versus Windows/MSSQL
Replies: 10
Views: 7739

For 60000 about 10 minutes (from 5 to 9) (but if "user daily" will be used...); for other in less than 1, max 2 minutes.
Regards
by mauriziog
11 Nov 2012 8:09
Forum: Exploitation / Operation
Topic: Linux/Oracle versus Windows/MSSQL
Replies: 10
Views: 7739

- NPD time at 00:00
- all jobs in SYSTEM (for production with 60.000)

In others NDP at 08:45 a.m, 08:00 a.m., 00:00, 13:00 p.m. and 50-70 % jobs in SYSTEM.