Search found 10 matches
- 27 Sep 2013 6:04
- Forum: Control-M Agents
- Topic: Getting Agent Version
- Replies: 3
- Views: 8116
- 25 Sep 2013 5:22
- Forum: Control-M Agents
- Topic: Getting Agent Version
- Replies: 3
- Views: 8116
Getting Agent Version
Is there a one line command that can be used to return the Agent version? I know we can get the agent version from the installed-versions.txt but I need to be able to script upgrade packages for different versions of the agent. Was looking for a one-liner that could give me back "6.4.00.300" indicat...
- 15 Aug 2013 6:31
- Forum: Job Definition
- Topic: syntax error
- Replies: 2
- Views: 3280
Windows Might be stripping it out since windows uses the percent symbol for %variableName% and for paths "\\myserver\myfolder\file%20name.txt". I would look into escape characters like in this post http://stackoverflow.com/questions/1907057/ignore-percent-sign-in-batch-file . Something like includin...
- 23 Jul 2013 10:39
- Forum: Job Definition
- Topic: 2 Groups of Jobs that cannot run at the same time
- Replies: 3
- Views: 3531
Correction. You are right, it does exist in V7 FP4. This will absolutely solve the original problem. When migrating from older versions of Control-M you will need to modify a EM System Parameter called "ControlResourceForSMARTTable" from 0 to 1. The parameter comes with this disclaimer: When set to ...
- 23 Jul 2013 10:18
- Forum: Job Definition
- Topic: 2 Groups of Jobs that cannot run at the same time
- Replies: 3
- Views: 3531
- 23 Jul 2013 10:13
- Forum: Control-M Server
- Topic: Set-up 2 Control M servers in same Physical Server (Linux)
- Replies: 4
- Views: 9659
- 22 Jul 2013 9:15
- Forum: Job Definition
- Topic: Hosts availability
- Replies: 4
- Views: 4666
- 22 Jul 2013 9:13
- Forum: Job Definition
- Topic: 2 Groups of Jobs that cannot run at the same time
- Replies: 3
- Views: 3531
2 Groups of Jobs that cannot run at the same time
Problem: 2 Groups of jobs. Each Group has 8 jobs (number of jobs doesn't matter). The jobs inside the group must run in parallel. The two groups can never run at the same time. They cannot use conditions. Exclusive resources will not allow the jobs inside the group to run at the same time. How do we...
- 22 Jul 2013 8:59
- Forum: Job Definition
- Topic: set up job for control-m agent down
- Replies: 3
- Views: 4383
It depends on your alerting system too (Not everyone can tie directly into Remedy or whatever alerting system they have). Some configurations (using the Patrol Control-M KM) will not alert on an Agent Unavailable alert but will alert on job failures. I believe this is corrected/added feature in the ...
- 16 Jul 2013 6:13
- Forum: Job Definition
- Topic: How to schedule Month new job
- Replies: 2
- Views: 3306
Select all the days in the Month 8-14, Select AND, select Sunday, Select all the months.
You should get something like this --> Screenshot
You should get something like this --> Screenshot