Search found 24 matches
- 13 Sep 2011 12:14
- Forum: Job Definition
- Topic: Problem in deploying new job
- Replies: 0
- Views: 23318
Problem in deploying new job
I'm using control-m in windows server and trying to deploy a cyclic job. I have created the job in XML with all parameter. But when I'm giving "CYCLIC=1" to make the job cyclic, I'm not able to deploy the job. But in the same XML if I'm changing the parameter "CYCLIC=0", it's getting deployed as a n...
- 21 Feb 2011 6:38
- Forum: Job Definition
- Topic: Job Scheduling problem
- Replies: 5
- Views: 3471
The above is not working
When I'm doing like this, the jobs are not getting ordered. Please provide some other solution.
- 21 Feb 2011 1:39
- Forum: Job Definition
- Topic: Job Scheduling problem
- Replies: 5
- Views: 3471
Job Scheduling problem
Hi Guys, I want to run a job from Monday to Friday except first and last day of month. That means if you take month of January as example, it'll not run on Jan 1st and Jan 31st. On other day it'll run from Monday to Friday every week. Can anyone please help how to configure the scheduling criteria f...
- 13 Dec 2010 11:27
- Forum: Scripts
- Topic: Delete a table from command line
- Replies: 13
- Views: 35014
Over write option
How can I use the overwrite (\O) option? Can anyone tell me the complete command?
To upload the CTM table I'm using the command as below -
defjob -u XXX -p XXX -s EM-DEV -src <Source>
To upload the CTM table I'm using the command as below -
defjob -u XXX -p XXX -s EM-DEV -src <Source>
- 08 Nov 2010 11:03
- Forum: Scripts
- Topic: Delete a table from command line
- Replies: 13
- Views: 35014
Delete a table from command line
Can anyone provide a script to delete the control-m tables from command line?
Before deploying a table, I need to delete the existing table from CTRL-M database. Currently I'm deleting it maually through Scheduling tab.
Before deploying a table, I need to delete the existing table from CTRL-M database. Currently I'm deleting it maually through Scheduling tab.
- 06 Oct 2010 11:09
- Forum: Job Definition
- Topic: what is Resource concept??
- Replies: 1
- Views: 2123
Resource
The Control resource parameter is used to control parallel execution of jobs. Control resources are defined using the CONTROL-M/EM Control Resources window. If a job requires exclusive use of a Control resource, only that job can use the Control resource. If another job requests the same resource in...
- 06 Oct 2010 11:05
- Forum: Job Definition
- Topic: Passing a value between jobs
- Replies: 4
- Views: 3917
Global variable
Hi, You can declare a global variable in "STEPS" tab and assign a value to that. You can use this value in any job in that environment of control-m. For example - On Stmt="*" CODE="OK" DOAUTOEDIT EXP="%%\MODE=N" /* Here MODE is the global variable*/ Now you can use this variable in any job as %%MODE.
- 06 Oct 2010 10:53
- Forum: Job Definition
- Topic: Job start time and end time
- Replies: 2
- Views: 3325
Job start time and end time
Is there any way I can get the job start time and end time from control-m and pass it as a parameter.
I want to pass the start time and end time as an autoedit parameter. So is there any system variable available in control-m to get these values?
I want to pass the start time and end time as an autoedit parameter. So is there any system variable available in control-m to get these values?
- 06 Oct 2010 10:48
- Forum: Job Definition
- Topic: Interval for cyclic jobs
- Replies: 3
- Views: 3105
Thanks a lot
Thanks a lot for the clarification.
- 17 Sep 2010 8:46
- Forum: Job Definition
- Topic: How to check Calender after job gets ordered
- Replies: 1
- Views: 1758
How to check Calender after job gets ordered
I have one cyclic job. I order it on every Sunday and it runs for the whole week. Now the requirement has come like this job should not run on 1st and last day of month. How can I do this? As per my understanding all the calendar check can be done before the table is getting ordered to E/M. After it...
- 30 Jul 2010 12:36
- Forum: Job Definition
- Topic: Interval for cyclic jobs
- Replies: 3
- Views: 3105
Interval for cyclic jobs
Hi Guys,
To set up interval there is a from parameter (similar to re run from) for cyclic jobs. It can have 3 values - STRT, END and TRGT.
Can anyone explain what is use of TRGT? How is it different from START parameter. Both seems to be same.
To set up interval there is a from parameter (similar to re run from) for cyclic jobs. It can have 3 values - STRT, END and TRGT.
Can anyone explain what is use of TRGT? How is it different from START parameter. Both seems to be same.
- 12 Jul 2010 2:00
- Forum: Monitoring
- Topic: Shout to E/M
- Replies: 1
- Views: 2406
Shout to E/M
I want to configure Latetime, Latesub and Exectime shouts in control-m. But I want to see the message on control-m E/M like a pop up or some kind of color change. Is this possible? From Control-m guide I found that the messages can only be sent to Console or to user. But nothing said about control-m...
- 18 Apr 2010 6:46
- Forum: Job Definition
- Topic: Can I send e-mail from control-m with attachment?
- Replies: 1
- Views: 6350
Can I send e-mail from control-m with attachment?
Can I send e-mail from control-m with attachment?
I'm running some batch jobs in control-m. The job will create a MS Excel file in server. Can I attach that file and send to someone through control-m e-mail configuration?
I'm running some batch jobs in control-m. The job will create a MS Excel file in server. Can I attach that file and send to someone through control-m e-mail configuration?
- 10 Apr 2010 5:50
- Forum: Job Definition
- Topic: Mutually exclusive between 2 groups
- Replies: 2
- Views: 2227
Resouce sharing
You can share resource between the jobs. For example share the same resource "A" between all the jobs.
- 11 Mar 2010 6:41
- Forum: Job Definition
- Topic: What is the use of shared control resource?
- Replies: 5
- Views: 5883