Search found 6 matches
- 15 Apr 2009 2:24
- Forum: Job Definition
- Topic: STATUS SET TO NOTOK AS A RESULT OF DO RERUN
- Replies: 9
- Views: 20797
STATUS SET TO NOTOK AS A RESULT OF DO RERUN
Has anyone seen this when using the rerun logic on the post proc steps? JOB STATE CHANGED TO Executing ENDED AT 20090415132133. OSCOMPSTAT 0. RUNCNT 1 STATUS SET TO NOTOK AS A RESULT OF DO RERUN ENDED NOTOK JOB STATE CHANGED TO Analyzed QUANTITATIVE RESOURCES RELEASED CONDITION OHH-TEST001-OK 0414 D...
- 12 Apr 2009 3:37
- Forum: Control-M Enterprise Manager
- Topic: Parameter setting
- Replies: 3
- Views: 2387
- 10 Apr 2009 5:47
- Forum: Control-M Enterprise Manager
- Topic: overwrite existing jobs using defjob utility
- Replies: 2
- Views: 2087
overwrite existing jobs using defjob utility
Hi, in the past when I have used the defjob utility to upload jobs, I have found that it uploads them in addition to the existing ones doubling them up rather than overwrites the existing ones. does anyone know how to overwrite existing jobs using defjob? or better still some way to easily modify ex...
- 02 Mar 2009 3:27
- Forum: Job Definition
- Topic: Dummy jobs when not scheduled
- Replies: 3
- Views: 2075
Dummy jobs when not scheduled
Hi, not sure if Im the only one with this problem but has anyone found a way of being able to have a single instance of a job which runs normally when scheduled, but when not schedueled still gets ordered in but id dummied? I have messed around with the overbins but that has too much of an overhead ...
- 16 Feb 2009 5:07
- Forum: Control-M Enterprise Manager
- Topic: Generate Flow diagram from CTM
- Replies: 4
- Views: 3367
Do you have any more info on yED? I've downloaded it but i think it will need converting to using XSLT - do you have that?valoche wrote:One of my colleagues had a successful experience with yEd to produce Control-M flow diagrams: http://www.yworks.com/en/products_yed_about.html
- 12 Feb 2009 5:39
- Forum: Control-M Enterprise Manager
- Topic: Generate Flow diagram from CTM
- Replies: 4
- Views: 3367
Generate Flow diagram from CTM
Hi, Has anyone ever been able to find a way to generate a flow diagram from Control-M as I need to create a doc of all the jobs and want to see if there's a quicker way of doing it rather than manually I know there was a way of creating a poster but want something slick and thought that maybe someon...