Hi brownbag,
Yes, I want to notify support that job failed again for the second (2nd) time and they need to check and investigate.
Thank you.
Search found 13 matches
- 16 Oct 2012 7:19
- Forum: Job Definition
- Topic: Job email notification workaround
- Replies: 5
- Views: 8971
- 18 Aug 2012 5:33
- Forum: Job Definition
- Topic: Job email notification workaround
- Replies: 5
- Views: 8971
Job email notification workaround
Hello Control-M Experts, Can someone suggest how I can create a workaround to my issue below: 1. I have a daily job (JobA) when failure occurs, I want to rerun it only 1 time. 2. JobA is set-up: On Steps tab: On NOTOK Do Rerun Do Mail (to support to fyi them that job will be rerun in next 30 minutes...
- 07 Mar 2012 7:31
- Forum: Monitoring
- Topic: Automate Check of missing Scheduling Table in daily load
- Replies: 3
- Views: 12166
Hi Sri, Our jobs are ordered by SYSTEM. BMC was engaged for the resolution of the issue however BMC was unable to find root cause and advised us that due to the version we are usung which is 6.3.01, there is limitation to go further and be able get the details on how the Sched table was deleted in t...
- 23 Feb 2012 9:24
- Forum: Monitoring
- Topic: Automate Check of missing Scheduling Table in daily load
- Replies: 3
- Views: 12166
Automate Check of missing Scheduling Table in daily load
Hello Control-M experts, I need an advice from you guys for our Control-M issue which lately has come up once or twice per month. The Issue is sometimes a whole scheduling table does not load at all after New Day process. The Application group will just know that jobs are missing from the schedule l...
- 31 May 2011 11:58
- Forum: Job Definition
- Topic: mass update of condition in the steps tab
- Replies: 3
- Views: 2575
- 25 May 2011 1:41
- Forum: Job Definition
- Topic: mass update of condition in the steps tab
- Replies: 3
- Views: 2575
mass update of condition in the steps tab
Hello Control-M experts,
Is there a way to mass update the do condition in the steps tab? We are running 6.3.01 ver. We have around 300 jobs that needs to be updated, i.e for the do condition from <condition>_Dv to <condition>_Ut.
Thanks in advance.
Is there a way to mass update the do condition in the steps tab? We are running 6.3.01 ver. We have around 300 jobs that needs to be updated, i.e for the do condition from <condition>_Dv to <condition>_Ut.
Thanks in advance.
- 27 Apr 2011 6:57
- Forum: Job Definition
- Topic: Workaround needed for Late time in Post Proc tab
- Replies: 5
- Views: 9218
- 20 Apr 2011 11:47
- Forum: Job Definition
- Topic: Workaround needed for Late time in Post Proc tab
- Replies: 5
- Views: 9218
Our newday load is at midnight (00:00). 1 of our user daily e.g. named A1DAILY loads at 10:00 a.m. same day. It includes for example jobs: A B C D - Job A runs between 22:00 to 23:00 of same day, once successfully done passes out condition to job B. - Job B runs from 23:01 to 03:00 of (next day), on...
- 19 Apr 2011 5:05
- Forum: Job Definition
- Topic: Workaround needed for Late time in Post Proc tab
- Replies: 5
- Views: 9218
Workaround needed for Late time in Post Proc tab
Hi All, We have a bunch of jobs that loads at midnight (00:00) current day and runs/executes the next day once in conditions are satisfied. When using late time in Post Proc tab to send a shout alert, the alert being sent is not accurate, probably due to the 24 hr limit value on the late time. Is th...
- 14 Apr 2011 12:47
- Forum: Job Definition
- Topic: Varaible for a previous day in Mmm-DD-YY (Apr-01-11) format
- Replies: 7
- Views: 9832
Thank you markf, jstarkw and matom for your valuable help. I have tested matom's instructions and it worked. I have not tested makf and jstarkw instruction but I am sure it will work. It's just that my senior Control-m administrator does not trust me enough to give me full acess to the ctm environme...
- 06 Apr 2011 12:17
- Forum: Job Definition
- Topic: Varaible for a previous day in Mmm-DD-YY (Apr-01-11) format
- Replies: 7
- Views: 9832
- 05 Apr 2011 11:51
- Forum: Job Definition
- Topic: Varaible for a previous day in Mmm-DD-YY (Apr-01-11) format
- Replies: 7
- Views: 9832
- 03 Apr 2011 12:26
- Forum: Job Definition
- Topic: Varaible for a previous day in Mmm-DD-YY (Apr-01-11) format
- Replies: 7
- Views: 9832
Varaible for a previous day in Mmm-DD-YY (Apr-01-11) format
Hi All,
Can anyone share their expertise with regards to creating a variable for a previous date with a format of Mmm-DD-YY e.g. Apr-01-11?
thanks in advance.
Can anyone share their expertise with regards to creating a variable for a previous date with a format of Mmm-DD-YY e.g. Apr-01-11?
thanks in advance.