Search found 5 matches

by flytripper
16 Sep 2006 2:47
Forum: Exploitation / Operation
Topic: RERUN a job from yesterday
Replies: 2
Views: 3360

RERUN a job from yesterday

I have an issue I am trying to work through. I have my Control-m set to start a new day of processing at 7:00am. However there are times where I find out after 7am that a job did not run correctly. After solving the issue, usually a file name issue, etc, I want to be able to rerun the job - from yes...
by flytripper
16 Sep 2006 2:42
Forum: Exploitation / Operation
Topic: Managing multiple jobs and reporting on status.
Replies: 6
Views: 6118

This worked out great...thanks.
by flytripper
11 Sep 2006 4:55
Forum: Exploitation / Operation
Topic: Managing multiple jobs and reporting on status.
Replies: 6
Views: 6118

I don't want to run the risk of asking to be spoon fed - but how in the heck do I use the ctmfw utility with a job? Or better yet, can you recommend reference material that I can read and teach myself? I have read through all of the BMC provided manuals on their site and how found that info lacking....
by flytripper
10 Sep 2006 3:24
Forum: Exploitation / Operation
Topic: Managing multiple jobs and reporting on status.
Replies: 6
Views: 6118

Thanks for your response... I am a little confused as to how the AUTOEDIT vars that you mentioned will be able to parse the file for that information. If they were static names/dates and sizes I would understand but all that info needs to be parsed live from the file. I was unable to find a var that...
by flytripper
09 Sep 2006 5:06
Forum: Exploitation / Operation
Topic: Managing multiple jobs and reporting on status.
Replies: 6
Views: 6118

Managing multiple jobs and reporting on status.

I am looking for some advice... I am currently managing 100+ File transfer jobs with various applications. I am trying to migrate these jobs to Control M w/AFT module. Currently my jobs need to perform the following tasks 1 monitor directory for existance of file 2 FTP that file to destination 3 rep...