It is currently 18 Aug 2017 7:05


Post new topic  Reply to topic  [ 2 posts ] 
Author Message
 Post subject: Control-M v8
PostPosted: 04 Mar 2013 4:40 
We will be upgrading Control-M for z/OS (v6.3.08) and Control-M for Distributed Systems (AIX - v6.4) to v8 over the next few months.

I am wondering, what issues, if any, people are experiencing or can be expected during and after this upgrade. Also, any helpful hints or tips that can be utilized.

We also use Oracle 11.2 for the database.


Top
   
 Post subject:
PostPosted: 06 Mar 2013 9:46 
Offline
Nouveau
Nouveau
User avatar

Joined: 26 Apr 2005 12:00
Posts: 695
Location: PARIS
Hi

Migration tools will provide correct way to migrate data.
But the most important things you need to see is about :

- vocabulary as scheduling table by folder...
- write and upload changed by check in and check out...
- utility's option modified and adapted with new vocabulary,
- and new console including GU, CCM, Desktop, and RF.

Migration will be as easy as previous version, but,
the most important will be to teach all user how to work with the new interface.


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 2 posts ] 

All times are UTC+02:00


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Limited
The site created by Franck YOT. Images, logo, content and trademarks about Control-M products are property of BMC Software.
All the comments are property of their posters. Images, logo, content and design are © copyright by Scheduler-Usage.com. All Rights Reserved