Scheduler Usage
http://scheduler-usage.com/

Cyclic Jobs. Is there a max run no
http://scheduler-usage.com/viewtopic.php?f=8&t=16408
Page 1 of 1

Author:  DreamBig [ 30 Jan 2019 12:42 ]
Post subject:  Cyclic Jobs. Is there a max run no

I have a job that will need to run every 5 mins almost all day.

Is there a limit to the number of times a job can run without breaking.

If I need to break it up into two or three consecutive jobs, say 200 each, I can do that.

Anyone know for sure?

Page 1 of 1 All times are UTC+01:00
Powered by phpBB® Forum Software © phpBB Limited
https://www.phpbb.com/