Hello folks, how are you doing?

I'll try to explain my problem.

The NDP is 11 am.
I have a cyclic job that must execute from 6am to 11pm, hourly, only on the second and the third workdays.

So i've created 2 jobs. One is scheduled on the workdays, and runs from 11am to 11pm. That's ok.

The other must be scheduled on the previous day from the 2nd and 3rd workdays, to run on the next workdays (i.e. must be scheduled on the day befor 2nd work day, and on the day before the 3rd work day).

But i've bumped into a bad situation with this second job.

For example, on November, the 2nd and 3rd workdays are on days 5 and 6 of the month. And we have a holiday here on day 2.

So this job is scheduled to enter on the first and the fifth days of november, and it's supposed to be scheduled on 4th and 5th.

How can i fix this? Which are the schedulling settings i need to use to schedule the jobs on the day before 2nd and 3rd work days, no matter if it isn't a workday?

Thanks in advance


Top
   
 Post subject:
PostPosted: 14 Aug 2012 11:14 
Offline
Nouveau
Nouveau
User avatar

Joined: 18 May 2010 12:00
Posts: 21
Location: EMEA
To schedule the job on the 2nd and 3rd workday, you specify D2,D3 and the workdays calendar in the Month Days-section.

To shift it one day, you should have a calendar with all days specified as working days. Now, as Confirmation Calendar, select this ALLDAYS calendar, select Shift: Ignore Job and By: -1


Top
   
 Post subject:
PostPosted: 14 Aug 2012 4:58 
Offline
Nouveau
Nouveau
User avatar

Joined: 27 Sep 2011 12:00
Posts: 13
Location: São Paulo
Yeah! Worked like a charm!

Thanks a lot, man... ;)


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 3 posts ] 

All times are UTC+02:00


Who is online

Users browsing this forum: Google [Bot] and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Limited
The site created by Franck YOT. Images, logo, content and trademarks about Control-M products are property of BMC Software.
All the comments are property of their posters. Images, logo, content and design are © copyright by Scheduler-Usage.com. All Rights Reserved