It is currently 16 Dec 2017 8:24


Post new topic  Reply to topic  [ 2 posts ] 
Author Message
PostPosted: 30 Sep 2011 5:31 
Offline
Nouveau
Nouveau
User avatar

Joined: 30 Sep 2011 12:00
Posts: 2
Hi,

Please help in scheduling the following requirements:

My new day procedure starts at 1PM everyday.
The jobs are loaded from Mon-Fri 7 AM
So effectively these jobs run at 7 AM on calendar days Tue-Sat.

Now, I want the job also to run on first and last working days of the month, even if they fall on calendar day Monday.

Should it be WEEKDAYS = 1,2,3,4,5 ; DAYS = D1, L1; DAYS_ANDOR = OR ?

Best,
Yusuf


Top
   
PostPosted: 31 Mar 2015 10:08 
Offline
Nouveau
Nouveau

Joined: 31 Mar 2015 9:50
Posts: 2
Since the new day is at 1300 every day . Schedule to the jobs run Sunday - Thu. SO that jobs will load on Sunday at 13:00 and Run on Mon @ 0700 .
You wanted run on 1st and last workday of the month, Use L1 and -L1 in in the Month days. Specify your calendar in-case if requires.


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 2 posts ] 

All times are UTC+01:00


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Limited
The site created by Franck YOT. Images, logo, content and trademarks about Control-M products are property of BMC Software.
All the comments are property of their posters. Images, logo, content and design are © copyright by Scheduler-Usage.com. All Rights Reserved