It is currently 15 Dec 2018 12:27


Post new topic  Reply to topic  [ 1 post ] 
Author Message
PostPosted: 22 Sep 2011 6:57 
Offline
Nouveau
Nouveau
User avatar

Joined: 17 Jul 2009 12:00
Posts: 3
Hi All,


I have problem in my Control-m.
I have 30 data center.Every day after NDP we are getting huge number of failure
alert in the alert window. Those job are failed for old odates.

Is there any automated script to delete all the failed jobs on weekly basis
before new day process.

Requirement: The script(job) will run on every day before NDP.
Failed jobs need to be deleted from old odates.

Kindly help me out.

Thanks in Advance......


Ram.


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 1 post ] 

All times are UTC+01:00


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Limited
The site created by Franck YOT. Images, logo, content and trademarks about Control-M products are property of BMC Software.
All the comments are property of their posters. Images, logo, content and design are © copyright by Scheduler-Usage.com. All Rights Reserved