PostPosted: 10 Feb 2010 4:09 
Offline
Nouveau
Nouveau
User avatar

Joined: 08 Oct 2007 12:00
Posts: 3
hi,

We have to change system date with a job but it hangs in executing.

It seems to make trouble with control-m Agent when we execute this script.


i've search through this forum and google and i've found nothing about...


Do you have some explanations or some tricks to fix this ?


Best regards.


Top
   
 Post subject:
PostPosted: 11 Feb 2010 4:58 
Offline
Nouveau
Nouveau
User avatar

Joined: 08 Jun 2007 12:00
Posts: 1148
Location: Ile de France
hy,
do the following:
right the orderid somewhere, ansd then on controlm server do a p_36 <order_id>, it should give you the exact orderno concerned by the problem, then you can manually modify the CMR_AJF table of your controlm server by using the following sql command :
update CMR_AJF set STATE = '5', OSCOMPSTAT=1, STATUS='N' where ORDERNO = <orderno>

finish by doing a hold/free of the job ,it should then go NOK

regards
philmalmaison


Top
   
 Post subject:
PostPosted: 12 Feb 2010 9:47 
Offline
Nouveau
Nouveau
User avatar

Joined: 08 Oct 2007 12:00
Posts: 3
(je pense qu'en français ce sera plus simple)

le problème n'est pas de remettre le job dans un état favorable a continuer la chaine mais entre dans un processus d'industrialisation d'installation applicative qui nécessitent d'être à la date du jour sur des serveurs ou la TRA ont eux besoin de faire des simulation avec une date serveur dans le futur ou le passé.

==================

the problem is not to put the job in a state favorable to continue the chain but enters a process of industrialization installation application that need to be at the time of day on servers or TRA need to have them make simulation with a time server in the future or the past.


Top
   
 Post subject:
PostPosted: 12 Feb 2010 2:01 
Offline
Nouveau
Nouveau
User avatar

Joined: 08 Jun 2007 12:00
Posts: 1148
Location: Ile de France
you're oblige to have a specific controlm server to do that, and play with ctmudlst utility to setup userdaily ODAT... that allow you to load userdaily system even if ODAT is in the past or in the futur.

regards
philmalmaison


Top
   
 Post subject:
PostPosted: 12 Feb 2010 4:38 
Offline
Nouveau
Nouveau
User avatar

Joined: 13 Jun 2007 12:00
Posts: 317
Have you tried the command to change system interactively that it does not wait for user input to complete?


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 5 posts ] 

All times are UTC+01:00


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Limited
The site created by Franck YOT. Images, logo, content and trademarks about Control-M products are property of BMC Software.
All the comments are property of their posters. Images, logo, content and design are © copyright by Scheduler-Usage.com. All Rights Reserved